CUSTOMER |
FINAL CLIENT |
DESCRIPTION |
AMOUNT IN EURO |
BIMA |
COGEL SERVICE |
Realization of electrical system and special systems of the point of sale COMBIPEL in Bastia Umbra (PG) |
46.481,00 |
|
MONTE DEI PASCHI DI SIENA |
MONTE DEI PASCHI DI SIENA |
Realization new telephonic electrical system, and data agency in Cesure (TR) |
9.812,00 |
|
MONTE DEI PASCHI DI SIENA |
MONTE DEI PASCHI DI SIENA |
Adaptation electrical systems various agencies in the centre of Italy |
8.562,00 |
|
MONTE DEI PASCHI DI SIENA |
MONTE DEI PASCHI DI SIENA |
Realization electrical systems branch office in Civita Castellana |
16.578,00 |
|
MONTE DEI PASCHI DI SIENA |
MONTE DEI PASCHI DI SIENA |
Realization of the branch office’s electrical system in Norcia (PG) |
12.911,00 |
|
MONTE DEI PASCHI DI SIENA |
MONTE DEI PASCHI DI SIENA |
Electrical system to be realised c/o the branch office in via Romagna (TR) |
8.779,00 |
|
MONTE DEI PASCHI DI SIENA |
MONTE DEI PASCHI DI SIENA |
Realization of electrical, telephonic systems and MONTE DEI PASCHI DI SIENA data transmission c/o the Branch office in Vallerano (VT) |
14.202,00 |
|
MONTE DEI PASCHI DI SIENA |
MONTE DEI PASCHI DI SIENA |
Realization of electrical, telephonic systems and data transmission c/o the Branch office in Rieti. |
18.282,00 |
|
MONTE DEI PASCHI DI SIENA |
MONTE DEI PASCHI DI SIENA |
Maintenance of electrical systems c/o branch offices in region Umbria. |
Canone annuo |
|
ISO-LAB |
ISO-LAB |
Realization of the conditioning system metrologic laboratory in Terni. |
8.263,00 |
|
COMUNI VARI |
IMPRESA GIUBILEI |
Public lighting systems in S.Lorenzo (Narni), c/o Fontana di Polo and c/o Campitelli (TR) |
4.260,00 |
|
COMUNE DI TERNI |
CITIS |
Realization equipment alimentation c/o site work Bibliomediateca in Terni |
30.367,00 |
|
FF.SS. |
COMAVI |
Realization lighting systems dof F.S. Ortana in Narni (TR) |
88.314,00 |
|
SOCIETA’ DI GESTIONE DELLO STUDIO RADIOLOGIA MADERNA |
SOCIETA’ DI GESTIONE DELLO STUDIO RADIOLOGIA MADERNA |
Works carried out c/o the Clinica Mediterranea for testing and normalization of electrical systems. |
7.488,00 |
|
SOCIETA’ ITALIANA CONDOTTE D’ACQUA |
SOCIETA’ ITALIANA CONDOTTE D’ACQUA |
Realization electrical and conditioning systems for the new rooms CED in Rome |
26.855,00 |
|
COMUNE DI MARINO |
SOCIETA’ ITALIANA PER CONDOTTE D’ACQUA |
Realization of the electro-mechanical systems of the new underground parking in Marino (RM) |
729.237,00 |
|
INTERMETRO |
SOCIETA’ ITALIANA PER CONDOTTE D’ACQUA |
Realization lifting apparatus relief wells subway B in Rome |
58.617,00 |
|
CONAD UMBRIA |
BIMA |
Supply and assembling of equipment for TVCC system c/o point of sale Combipel in Terni |
6.972,00 |
|
BRIGANTI |
BRIGANTI |
Electrical works for adaptation shop boards and works for emergency lighting system |
8.056,00 |
|
BRIGANTI |
BRIGANTI |
Remaking of lighting system/F.M. c/o shop in Terni. |
40.283,00 |
|
FIAT MIRAFIORI |
FISIA ITALIMPIANTI |
Electrical instrumental ecologic area c/o FIAT plant in Sulmona |
116.202,00 |
|
COMUNE DI FIRENZE |
FISIA ITALIMPIANTI |
Electro instrumental assemblings realized c/o water disposal plant in San Colombano (FI) included the realization of the work to complete 1° lot as per variation evaluation |
719.424,00 |
|
CENTRO MULTIMEDIALE |
CENTRO MULTIMEDIALE |
Modifications and integrations on technological plants and maintenance on Mediabiblioteca and Videocentre |
6.713,00 |
|
COMUNE D I FIRENZE |
OZONO ELETTRONICA INTERNAZIONALE |
Electrical plant design and mechanical assemblings of water treatment plant in San Colombano (FI) |
27.372,00 |
|
ACCIAI SPECIALI TERNI |
I.T.M. |
Electrical works c/o AST plants in Terni |
55.777,00 |
|
COMUNE DI FIRENZE |
FISIA ITALIMPIANTI |
Electrical and hydraulic assistance and management c/o depuration plant in San Colombian (FI). |
20.141,00 |
|
COMUNE DI FIRENZE |
FISIA ITALIMPIANTI |
Supplementary electrical works to “side board do” c/o Candice (FI). |
64.557,00 |
|
FF.SS. |
GRANDI STAZIONI |
Electrical system new rooms c/o station Rome Termini |
7.372,00 |
|
IMPRESA CHITARRINI |
IMPRESA CHITARRINI |
Realization of technological plants for building in loc. Portano a Terni. |
10.845,00 |
|
CONAD UMBRIA |
ASSOCIAZIONE CLUB AMICI DI NOCERA |
Electrical systems scholastic plant in Nocera Umbra. |
18.075,00 |
|
CONAD UMBRIA |
PAC 2000 A |
Extra electrical works realized c/o school in Nocera Umbra. |
5.422,00 |
|
BANCA POPOLARE DI RIETI |
ELETTROIMPIANTI |
Realization of technological plants realized c/o the Banca Popolare in Rieti and of Branch office in Greccio. |
13.789,00 |
|
BANCA POPOLARE DI SPOLETO |
BANCA POPOLARE DI SPOLETO |
Realization electrical systems c/o new branch c/o Commercial Centre “Il Giardino” in Rieti. |
3.795,20 |
|
GIO.CO |
GIO.CO |
Realization systems c/o new horse racing agency in Narni Scalo (TR). |
56.810,00 |
|
A.I. GIORNELLI |
A.I. GIORNELLI |
Realization systems c/o horse racing agency in Via Seneca – Rome. |
77.468,00 |
|
G.A.I.T. |
G.A.I.T. |
Realization systems c/o horse racing agency in Via Farini – Terni. |
88.830,00 |
|
G.A.I.T. |
G.A.I.T. |
Realization electrical and air conditioning systems c/o horse racing agency in IL POLO – Terni. |
51.025,00 |
|
MEGACOLOR |
MEGACOLOR |
Realization systems c/o new industrial building in Loc. sabbione (TR). |
36.151,00 |
|
PROGETTO A.R.P. S.r.l. |
TONIC NETWORK |
Electrical and thermo hydraulic systems polyfunctional plant in Via del Centrenario in Terni |
1.032.913,00 |
|
STUDIO GANTES |
TONIC NETWORK |
Planning technological plants sporting centre “Ex Cinema Cielo” |
18.075,00 |
|
AURORA S.R.L. |
TONIC NETWORK |
Planning and realization technological plants and fire prevention practise sportive centre “Novate Milanese” |
465.000,00 |
|
VITAWELL S.P.A. |
TONIC NETWORK |
Planning and realization technological plants and fire prevention practise sportive centre “Via Cassinis – Milano” |
20.000,00 |
|
VITAWELL S.P.A. |
TONIC NETWORK |
Planning and realization technological plants and fire prevention practise sportive centre “Via Mestre – Milano” |
281.469,00 |
|
VITAWELL S.P.A. |
TONIC NETWORK |
Planning and realization technological plants sportive centre in As coli Piceno. |
356.355,00 |
|
MARINELLI S.P.A. |
MARINELLI S.P.A. |
Hydro-thermo-sanitary + electrical plant systems subjected c/o Directional Centre in Via Bramante in Terni. |
387.342,00 |
|
ROSSI S.P.A. |
ROSSI S.P.A. |
Extraordinary maintenance works and setting at work c/o Mercedes Benz seat in Narni Scalo (TR) |
444.344,60 |
|
TECNOCENTRO |
TECNOCENTRO |
Disassembly, trasport, riassembling electrical boards and realization electrical plant design of the painting line coils MRT |
131.000,00 |
|
TECNOCENTRO |
TECNOCENTRO |
Supply electrical boards c/o TIFAST plant in San Liberato |
35.000,00 |
|
TECNOCENTRO |
TECNOCENTRO |
Supply electrical boards c/o TIFAST plant in San Liberato |
122.366,00 |
|
TIFAST |
TIFAST |
Electrical secondary distribution, supply and laying electrical boards. Realization secondary round system, modifications PC QB6, connexion Enel delivery cabin, supply protection board sand filter, suppy MCC board MCC workshop, connexion well levels, connexions MCC boards scrap workshop, c/o San Liberato plant. |
310.143,80 |
|
TIFAST |
TIFAST |
Assembling system and alimentation traveling cranes C1-C2-C5-C4-C6 MT c/o San Liberato plant. |
136.334,00 |
|
HOTEL DE PARIS |
HOTEL DE PARIS |
Substitution thermo central board c/o Hotel in Terni in Via della Station. |
6.316,80 |
|