CUSTOMER | FINAL CLIENT | DESCRIPTION | AMOUNT IN EURO | |
AVIR | AVIR | Completion of connexions new logic of raw materials loading weighing, composition plant c/o the plant in Aprilia | 90.379,00 | |
AVIR | AVIR | Electrical systems on furnace board and machines, of furnace 1 c/o the plant in Aprilia | 37.184,00 | |
AVIR | AVIR | Realization of the electrical systems of new directional offices c/o Corsico centre | 30.367,00 | |
AVIR | AVIR | Stops of the electrical systems c/o new offices in Corsico (MI) | 5.061,00 | |
AVIR | AVIR | Stops engines of furnaces charging, alimentation cooling ventilator conveyor, remaking of thermocouples electrode holders, completion composition plant on machines edge, earthing new hangar warehouse c/o the plant in Aprilia | 7.746,00 | |
AVIR | AVIR | Completion works composition plant on machines edge c/o plant in Aprilia. | 5.164,00 | |
AVIR | AVIR | Hardening and tempering to normalize the electrica systems according to law 46/90 to the plant in Aprilia | 64.040,00 | |
AVIR | AVIR | Restoration of connexions electrical boosting furnace 1 damaged by the glass leak c/o the plant in Asti | 41.316,00 | |
AVIR | AVIR | Installation of telecamera in the composition plant and various completion plants c/o the plant in Aprilia | 14.305,00 | |
AVIR | AVIR | Realization o new office SICRA, new archives BORMA and measuring of the energy absorbed by all the offices in Corsico (MI) | 6.713,00 | |
AVIR | AVIR | Realization of electrical systems to enlarge the directional offices in Corsico | 8.676,00 | |
AVIR | AVIR | Emergency work carried out c/o the plant in Aprilia to restore the alimentation of privileged users | 8.366,00 | |
AVIR | AVIR | Electro-instrumental plant design on : molding machine 13 – channel 13 – ventilator cooling machine 13 c/o the plant in Aprilia | 30.470,00 | |
AVIR | AVIR | Insertion of energy meters on general board of B.T. power centre c/o the plant in Aprilia | 9.812,00 | |
AVIR | AVIR | Electrical works carried out c/o the plant in Sesto Calende | 5.267,00 | |
AVIR | AVIR | Electric works for new moldinhg machine 23 in the plant in Aprilia | 27.372,00 | |
AVIR | AVIR | Electrical systems machine IS43 BDF c/o the plant in Aprilia | 16.423,00 | |
AVIR | AVIR | Realization of electrical plant design for boosting F4 c/o the plant in Aprilia | 155.969,00 | |
AVIR | AVIR | Modification plant design for the new furnace 4 realized c/o the plant in Aprilia | 216.911,00 | |
AVIR | AVIR | Electrical plant design boosting furnace 2 c/o plant di Aprilia | 125.653,00 | |
AVIR | AVIR | Remaking of general boards M.T. electrical protection and connexions Trafo c/o the plant in Aprilia | 130.147,00 | |
AVIR | AVIR | Electric works on molding machine 42 c/o the plant in Aprilia | 25.306,00 | |
AVIR | AVIR | Works for electrical connexions new loading belt scrap, glass hoppers furnaces, modification panelboard and power zippe I4, modification of the regaining scrap plant for the insertion of n° 2 hoppers c/o the plant in Aprilia. | 25.306,00 | |
AVIR | AVIR | Electrical works relative to the machine 21 c/o the plant in Aprilia | 24.428,00 | |
AVIR | AVIR | Electrical plant design new machine 41 c/o the plant in Aprilia | 16.526,00 | |
AVIR | AVIR | Realization electrical plant design new furnace 2 of the plant in Bari | 426.076,00 | |
AVIR | AVIR | Assembling inspection systems choice line furnace 1 plant in Bari. | 35.377,00 | |
AVIR | AVIR | Realization of electrical general distribution systems MT/BT plant in Bari. | 671.393,00 | |
AVIR | AVIR | Restoration of electrical system furnace of the plant Sesto Calende (VA) | 7.230,00 | |
AVIR | AVIR | Electrical plant design for installation boosting in Origgio (VA) | 193.671,00 | |
AVIR | AVIR | Displacement and modification molding machine 21, alimentation ventilators c/o the plant Aprilia | 34.602,00 | |
AVIR | AVIR | Works to increase the electrical system furnace 1 c/o the plant in Bari. | 15.751,00 | |
AVIR | AVIR | Realization of lighting system of the plant and offices in Bari. | 20.813,00 | |
AVIR | AVIR | Realization of electrical works for the molding machine12 c/o the plant in Bari. | 15.493,00 | |
AVIR | AVIR | Works for boosting furnace 1 electrical and setting systems, various connexions c/o the plant in Asti. | 129.114,00 | |
AVIR | AVIR | Realization of connexions to n. 12 electrodes boilers area to the furnace 2 c/o the plant in Asti. | 51.645,00 | |
AVIR | AVIR | Supervision line systems PLC c/o plant di Bari | 32.949,00 | |
AVIR | AVIR | Modification of directional offices in Corsico | 8.676,00 | |
AVIR | AVIR | Realization electrical systems choice lines furnace 4 c/o the plant in Corsico. | 124.466,00 | |
AVIR | AVIR | Electrical works c/o the plant in Bari | 50.160,00 | |
AVIR | AVIR | Electric works for adaptation systems c/o plant in Napoli | 25.616,00 | |
AVIR | AVIR | Disassembling of machines 42-43 and installation of systems for new molding machine 42 c/o the plant in Aprilia | 41.006,00 | |
AVIR | AVIR | Disassembling of electrical systems, supply and assembling of new plants to remake furnace 2 c/o the plant in Asti | 205.033,00 | |
AVIR | AVIR | Restoration of systems on furnace 1 and electrical works relative to new molding machines 11, 12 e 13 c/o the plants in Bologna | 98.075,00 | |
AVIR | AVIR | Modification water circulation circuit Zippe c/o the plant in Sangemini (TR) | 33..569,00 | |
AVIR | AVIR | Electrical connexions for the new transport system of the hoppers composition to the frnaces hoppers c/o plant di Aprilia | 51.387,00 | |
AVIR | AVIR | Insertion of energy meters on general board B.T. Power Centre c/o the plant in Aprilia | 83.666,00 | |
AVIR | AVIR | Supply of board with transformer to alimentate the plants in the cooling area c/o the plant in Bari | 11.052,00 | |
AVIR | AVIR | Electro-instrumental plant design molding machine 13 canale 13 c/o the plant in Aprilia | 30.470,00 | |
AVIR | AVIR | Automatic pressure control c/o the plant in Bari | 10.401,00 | |
AVIR | AVIR | Realization of electrical systems c/o the plant in Mezzocorona | 578.948,00 | |
AVIR | AVIR | Local power factor improvement c/o the plant in Mezzocorona. | 12.859,00 | |
AVIR | AVIR | Examination, tests and certifications of the electrical systems in relation to the new rules in force c/o the plant in Bologna | 10.254,00 | |
AVIR | AVIR | Modification of fire prevention network realized c/o the plant in Sangemini. | 17.559,00 | |
AVIR | AVIR | Remake of general lighting /fm in acc. to the rules in force and modification of lighting systems in the AVIR warehouse finished product c/o plant in Sangemini. | 12.911,00 | |
AVIR | AVIR | Electrical line for offices alimentation c/o the plant in Sangemini | 4.131,00 | |
AVIR | AVIR | Electrical systems lighting machines and arrest systems c/o the plant in Sangemini. | 18.075,00 | |
AVIR | AVIR | Substitution power factor improvement general board in BT cabin and various electrical works carried out c/o the plant in Sangemini. | 17.043,00 | |
AVIR | AVIR | Electrical plant design relative to the installation boosting F2 c/o the plant in Villotta di Chions (PN). | 129.114,00 | |
AVIR | AVIR | Electrical plant design relative to the installation of boosting furnace 1 realized c/o the plant in Villotta di Chions (PN). | 104.324,00 | |
AVIR | AVIR | Electrical general systems and modifications to connect boosting furnace 1 c/o the plant in Villotta di Chions (PN). | 320.203,00 | |
AVIR | AVIR | Works for the realization of M.T. electrical systems and primary distribution B.T. furnace 1 c/o the plant in San Polo di Piave (TV) | 149.772,00 | |
AVIR | AVIR | Construction of connexion plants field of the instrumentation of the new furnace 1, snug, channels, machines IS and construction of electrical connexion systems between the busway and the various users of the furnace 1 realized c/o the plant in San Polo di Piave (TV) | 160.101,00 | |
AVIR | AVIR | Electrical plant design zippe water circulation and completion works F1 realized c/o the plant in San Polo di Piave (TV). | 5.990,00 | |
AVIR | AVIR | Works for the realization of glass scrap circulation system furnace realized c/o the plant in San Polo di Piave (TV). | 55.519,00 | |
AVIR | AVIR | Completion systems new furnace realized c/o San Polo di Piave AVIR (TV) plant. | 52.678,00 | |
AVIR | AVIR | Supply of star/delta telestarters for cooling ventilator conveyor 30KW machines 11-12 c/o San Polo di Piave (TV) plant. | 26.339,00 | |
AVIR | AVIR | Verification protection from indirect contacts of the plant in Elmas (CA) | 4.854,00 | |
AVIR | AVIR | Various electrical plant design works realized c/o the plant in Elmas (CA). | 79.792,00 | |
AVIR | AVIR | Electro-instrumental plants in Castelmaggiore (BO). | 23.240,00 | |
AVIR | AVIR | Work on boostings ovens 3-4 c/o the plant in Castelmaggiore (BO) | 7.488,00 | |
AVIR | AVIR | Electrical plant design for zippe water circulation realized c/o the plant in Castelmaggiore (BO). | 29.954,00 | |
AVIR | AVIR | Electrical general systems, distribution furnace 3, assembling of boosting system, c/o the plant in Castelmaggiore | 402.836,00 | |
AVIR | AVIR | Plant design machine 31-33 and cooling system boosting oven, c/o the plant in Castelmaggiore (BO): | 96.577,00 | |
AVIR | AVIR | Electrical plant design restoration system users of softened water levels , c/o the plant in Castelmaggiore (BO). | 15.493,00 | |
SAN DOMENICO VETRARIA | SAN DOMENICO VETRARIA | Alimentation new compressor, ventilators, towers, sockets FM molding plant. | 33.466,00 | |
SAN DOMENICO VETRARIA | SAN DOMENICO VETRARIA | Execution of electrical general systems, electrical connexions boosting oven, cooling system boosting oven. | 423.494,00 | |
AVIR | BORMA | Verification electrical systems and maintenance of the plant in Napoli | 12.246,00 | |
AVIR | BORMA | Verification and test of the electrical systems in acc. to the rules in force c/o the plant in Acqui Terme (AL) | 11.620,00 | |
AVIR | AVIR | Electrical plant design boosting furnace plant in Pergine (TN) | 96.370,00 | |
VETRERIE MERIDIONALI | VETRERIE MERIDIONALI | Realization of electrical general systems distribution MT e BT c/o the plant in Castellana Grotte (BA). | 490.634,00 | |
SICILVETRO | SICILVETRO | Substitution transformers c/o the plant in Marsala. | 41.833,00 | |
AVIR | AVIR | Electrical system inspection line 23 c/o the plant in Aprilia. | 24.531,00 | |
AVIR | AVIr | 1-Electrical general systems MT cabin transformation F1 e F2, connexions boosting system F1, control board boosting a 12 electrodes, c/o the plant in Aprilia. | 469.975,00 | |
AVIR | AVIR | Instrumentation assembling F1 c/o the plant in Castelmaggiore | 40.025,00 | |
AVIR | AVIR | Lighting system, sockets and various electrical filters c/o the plant in Corsico | 15.751,00 | |
AVIR | AVIR | Lighting system, sockets , electrical filter c/o the plant in Origgio | 16.474,00 | |
AVIR | AVIR | Supply board PC 6300A 100KA c/o the plant in Asti. | 150.030,00 | |
MOPLEFAN | MOPLEFAN | Supply tboard Power Centre linea B30 c/o the plant in Terni | 132.987,00 | |
MOPLEFAN | MOPLEFAN | Assembling of n. 2 departments Metal Clad card of central station, harness and assembling of electric board, assembling and connexion stops, connexion conditioner warehouse film, maintenance of electric cabins, works to move the Dusembery 2000 cutter with modifications steel structural works transport system, distribution system sockets F.M. Extrusion workshop c/o the plant in Terni. | 18.592,00 | |
MOPLEFAN | MOPLEFAN | Erection of smoke anf methane sensing systems c/o the plant in Terni | 41.316,00 | |
MOPLEFAN | NUOVA MAGRINI GALILEO | Assembling electrical board M.T. c/o the Moplefan plant in Terni | 7.746,00 | |
MOPLEFAN | MOPLEFAN | Setting of transformer MT 2,5 KVA and realization alarm control room line B30. | 5.422,00 | |
SGL CARBON | SGL CARBON | Realization electrical treatment system and cooling water monitoring by closed circuit of gf2. | 84.363,00 | |
AVIR S.P.A. | AVIR S.P.A. | Electrical modifications composition plant c/o the plant in Aprilia. | 91.200,00 | |
AVIR S.P.A. | AVIR S.P.A. | Boosting furnace 4, control board boosting by 12 electrodes F4, cooling system boosting F4 c/o the plant in Aprilia. | 150.000,00 | |
AVIR S.P.A. | AVIR S.P.A. | Electrical systems central transformer room and distribution furnace 4 c/o the plant in Aprilia. | 360.000,00 | |
AVIR S.P.A. | AVIR S.P.A. | Electrical connexions power centre c/o the plant in Asti | 68.000,00 | |
AVIR S.P.A. | AVIR S.P.A. | Supply board PC 6300 A 100 KA c/o the plant in Asti. | 150.000,00 | |
AVIR S.P.A. | AVIR S.P.A. | Electrical system distribution furnace 2 c/o the plant in Villotta di Chions (PN) | 800.000,00 | |
SICILVETRO S.P.A. | SICILVETRO S.P.A. | Electric connexions system distribution F2 c/o plant di Marsala. | 798.000,00 | |
AVIR S.P.A. | AVIR S.P.A. | Substitution of transformer and supply of control board c/o the plant in Mezzocorona | 32.000,00 | |
AVIR S.P.A. | AVIR S.P.A. | Realization last part boosting system c/o the plant in Origgio | 28.500,00 | |
CORSICO VETRO | CORSICO VETRO | Modification duct bus bar boosting furnace 2 realized c/o the plant in Corsico | 12.000,00 | |
AVIR S.P.A. | AVIR S.P.A. | Realization of electrical boosting furnace 1 c/o the plant in Bari. | 200.000,00 | |
AVIR S.P.A. | AVIR S.P.A. | Restoration boosting furnace 1 and auxiliary cables system c/o the plant in Castel Maggiore. | 58.500,00 | |
AVIR S.P.A. | AVIR S.P.A. | Primary distribution new electrical transformer room compressors room c/o the plant in San Polo | 150.000,00 | |
AVIR S.P.A. | AVIR S.P.A. | Supply board PCV c/o plant in Napoli (molding department). | 26.800,00 | |
AVIR S.P.A. | AVIR S.P.A. | Realization boosting furnace 1 c/o the plant in Sangemini | 185.000,00 | |
AVIR S.P.A. | AVIR S.P.A. | Realization new distribution plant c/o Sangemini plant | 205.000,00 | |
BORMIOLI ROCCO | BORMIOLI ROCCO | Supervision systems of production and quality c/o the plant in Bergantino. | 50.000,00 | |
AVIR S.P.A. | AVIR S.P.A. | Substitution duct bas bar Zucchini c/o the plant in Sangemini | 13.900,00 | |
AVIR S.P.A. | AVIR S.P.A. | Electrical works MT in delivery cabin and transformer room MT and BT plant in Marsala | 2.750,00 | |
AVIR S.P.A. | AVIR S.P.A. | Electrical maintenance transformer room electric boards MT and BT in Marsala plant | 5.300,00 | |
AVIR S.P.A. | AVIR S.P.A. | Adaptation boards MT in acc. to DK 5600 c/o the plant in Villotta. | 42.000,00 | |
VETRERIE MERIDIONALI S.P.A. | VETRERIE MERIDIONALI S.P.A. | Adaptation boards MT Adaptation boards DK 5600 c/o the plant in Castellana Grotte (BA) | 25.000,00 | |
VETRERIE MERIDIONALI S.P.A. | VETRERIE MERIDIONALI S.P.A. | Realization of electrical distribution systems furnace 1 c/o the plant in Castellana Grotte (BA) | 334.600,00 | |
VETRERIE MERIDIONALI S.P.A. | VETRERIE MERIDIONALI S.P.A. | Realization of electrical system boosting furnace 1 c/o the plant in Castellana Grotte (BA) | 185.000,00 | |
MIR SNC | MIR SNC | Alimentation heating system c/o the plant O-I in Sangemini | 3.550,00 | |
BORMIOLI ROCCO | BORMIOLI ROCCO | Electrical works in cabin MT/BT plant in Altare | 93.974,00 | |
O-I Manufacturing Italy SpA | O-I Manufacturing Italy SpA | Electrical works for adaptation delivery cabin in acc. toDK5600 | 40.700,00 |